![]() These firmware versions were released to SetApp packages in May 2022 for all SolarEdge SetApp-enabled devices. The CPU version for all SetApp-enabled inverters is 4.15.119 Resetting Synergy 120k inverter during Pre-Commissioning when solar-powered and a power-bank is not connected shuts down the systemįirmware was released for the SetApp-enabled SolarEdge Home Hub inverters with Prism Technology as well as supported devices and batteries in May 2022.Workaround: re-associating the inverter and batteries fixes this issue When replacing inverter and associating the existing batteries on site, sometimes the batteries may appear as (0). ![]() When MSC configured, battery charge/discharge display may change – display issue.Energy Net module swapping to a different inverter requires support assistance.Switching from Energy Net to RS485 requires removal of the Energy Net module from the inverter and inverter’s AC cycle.SolarEdge Home Battery firmware upgrade (from SMCU version When the battery SoE reaches 100%, it may discharge by a few percent before starting to charge again.In rare cases, SetApp may show incorrect battery power or energy.In some cases, SolarEdge Home battery upgrade fails when the battery is in Power Save Mode. ![]() Workaround: solve the DC association failure cause and re-associate In multiple battery configuration, if one battery fails DC association following batteries will fail as well.In some cases, the battery error LED may light when turning on the battery. ![]() Workaround: Set both Vgrid max #2 and Vgrid max #5 to the same value (typically 400)
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |